We would like to point out the investment projection regarding the Integrated Circular Maritime Economy System (ICME ™) operation in the West Nusa Tenggara province. As previously explained, various output commodities are produced: Electricity, Fresh Water, High Level Salt and its derivatives, Fishery Products, Vegetables, Eco-/Edu-tourism and R&D.

The planned project capacity outputs are as follows:
• Solar Power: 5200 kilowatts per day
• Hydroelectric Power from Wind Turbines: 2400 kilowatts per day
• Raw Water: 500,000 liters per day
• Salt: 15,000 kilograms per day
• Hydrogen : 45,900 m3 per day
• Vegetables: 136,967 kilograms per year
• Fishery Yield: 27,945 kilograms per year
The estimated project budget for full capacity as described above is USD 32,784,000 with an estimated breakeven point in 78 months. The IRR that will be generated from this project is 21% with a calculation period of 25 years.